PROFESSIONAL EXPERIENCE SUMMARY
Over 49 years of comprehensive experience with capital-intensive projects for the electric power, pulp & paper, and Hydrogen industries with a focus upon equipment design, performance optimization, operation and maintenance effectiveness, risk management strategies and profit enhancement issues.
Technology Risk Management
Energy & Renewable Energy
Hydrogen (Fuel Cells, Fueling Stations, Industrial applications)
Thermodynamics
Engineering Economy
PUBLICATIONS
- “Applying Risk Management Strategies Prudently”, (Co-Authored), International Council for Hydrogen Safety, San Francisco, CA, September 2011.
- “Navigating The Permitting Process, A New York State Perspective”, Fuel Cell Council / NHA Fuel Cell Seminar, San Antonio, TX, October 2007.
- Handling Hydrogen Short-Course – “Hydrogen Safety Specialist Certification” National Hydrogen Association’s Fuel Cell Seminar, San Antonio, TX, November 1, 2004.
- “Fueling The Hydrogen Economy With Confidence: Mitigating the Risk Exposures Inherent To Hydrogen Depots” (co-authored) National Hydrogen Association Conference, April 2004.
- “Assessing Investment Risk For Power Generation Facilities” (Co-Authored) International Joint Power Generation Conference, San Francisco, CA, July 1999.
- “Hydrogen Stewardship Based On Risk Hazards” - 10th Annual U.S. Hydrogen Meeting of the National Hydrogen Association, Vienna, VA, April 1999.
- “Managing the Total Cost of Risk Exposures Through Risk Mapping Techniques”, International Joint Power Generation Conference, Baltimore, MD, August 1998
- “Managing the Total Risk” - contributing author of a chapter in The Sourcebook for Competitive Powerplant Management, published by McGraw-Hill Companies, 1998.
- “Recommendations For maximizing Return On Investment For Hydrogen Projects Through Use Of Safety Systems”, - 9Th Annual U.S. Hydrogen Meeting of the National Hydrogen Association, Vienna, VA, April 1998.
- “Piping risk management - Avoid Piping Pitfalls, Power Engineering, November 1997.
- “Improving Market Competitiveness Through Reliability and Risk Analysis”, International Joint Power Generation Conference, Denver, CO, November 1997. “Breaking Down the Commercialization Barriers for Expanding the Use of H 2”, National Hydrogen Association’s Advocate, Autumn 1997.
- “Managing ‘risk externalities’ in today’s business climate”, Power, July/August 1997. “Report: Reduce hidden project risks with new tactics”, Electrical World, May 1997.
- “Managing the Total Cost of Risk in Competitive Electric Generation” – (Co-Authored) with Jason Makansi of Power and Marie Leone of Electrical World, published and sold by the McGraw-Hill Companies, 1997.
- “Insurance Issues With Repowering Projects” - EPRI’s Repowering Applications User Group Conference, November 6, 1996 in Lake Charles, LA..
- “Large Capacity Gas Turbines: Managing The Risk And Delivering The Promise” - IGTI’s Global Gas Turbine News, Volume 36:1996, No. 3 (co-authored with EPRI).
- “Quantification of Risks From Technology For Improved Plant Reliability” for International Joint Power Generation Conference, October 14, 1996 in Houston, TX.
- “Pipeline to risk: Technology insurance explained” - Electrical World, November 1995.
- “ISO standards’ bottom-line impact” - Electrical World, September 1995.
- March 1995 cover story for Electrical World; “Unlocking a potential paradise or competitive chaos?”
- “ISO 14000: Global common ground for the environment” - Electrical World, November 1994.
- "Talking to Operators About Boiler Maintenance" (Interview Article) - Engineered Systems, September 1992.
- "Ground Water: Keeping It Clean" - Locomotive, Fall - 1992 Issue.
- "Effective Risk Management for Project Development" - CIBO Cogen II Conference, May 5, 1992 in Richmond, VA.
- "Preparing for a Safe Boiler Startup" - Plant Engineering, October 1991.
- "Clean Air Technology" - Locomotive, Fall - 1991 Issue.
- Standard Handbook of Power Plant Engineering - published by McGraw-Hill, 1989 Contributing Author of a Chapter Regarding Ash Removal Systems.
- "Ash Management Considerations for Refuse-Fired Boilers", 11th A.S.M.E. National Waste Processing Conference.
- "Minimizing Waste Water with Bottom Ash Recirculation Systems" - Power Engineering, June 1984.
"Ash Removal from Industrial Boilers - The Changing Scene" - Power, September 1982.
Received two US Patents for designs associated with fossil fuel fired power plant boilers
ASME
Courses taught at Central
ENGR 150 ETM 358 ME 370
ET 251 ETM 360 ME 458
ET 252 ETM 367
ET 399 ETM 399